Membreys Road (Rural Road) – Between chainage 0.210 kilometres and 0.660 kilometres.
The road pavement and surface has significantly deteriorated. There is substantial rutting and potholing along the road length. Road is too narrow to cater for heavy vehicles resulting in vehicular conflicts. The road will be fully rehabilitated, including the additional of pavement material, widening, drainage and then a final seal.
Project completed: 1 June 2025
Funding Source | Australian Government: $460,000.00