Wannon Projects

Projects

Infrastructure

Twelve Apostles Visitor Centre

$88000000

Keerray Woorroong Visitor Centre (part of the Twelve Apostles Precinct Redevelopment). Located near Princetown, the 3,300m² centre features a 230-seat café, a kiosk, gallery

Roads

Princes Highway West – Winchelsea to Colac duplication

$168734500

Extra lanes added on the Princes Highway between Winchelsea and Colac. The upgrade was completed in 4 sections: Deans Marsh Road, Winchelsea to ArmytageArmytage

Roads

Great Ocean Road upgrade

Great Ocean Road upgrade Responsible entity for the works | Victorian Government Project completed: 2018 Funding Source | Australian Government, Infrastructure Investment Program: $25,000,000

Roads

Roads to Recovery – Woorndoo-Streatham Road, Nerrin Nerrin

$550000

Woorndoo-Streatham Road (Rural Road) – Between chainage 10.390 kilometres and 13.451 kilometres measured from start. The road pavement and surface has significantly deteriorated. There

Roads

Roads to Recovery – Markwells Road, Purnim

$375000

Markwells Road (Rural Road) – Between chainage 0.789 kilometres and 2.400 kilometres measured from start. The road pavement and surface has significantly deteriorated. There

Roads

Roads to Recovery – Hughs Road, Purnim West

$600000

The road pavement and surface has significantly deteriorated. There is substantial rutting and potholing along the road length. The road will be fully rehabilitated,

Roads

Roads to Recovery – Dunnes Road, Winslow

$250000

The road pavement and surface has significantly deteriorated. There is substantial rutting and potholing along the road length. The road is too narrow to

Roads

Roads to Recovery – Boggy Creek Road, Curdievale

$775000

The road pavement and surface has significantly deteriorated. There is substantial rutting and potholing along the road length. The road will be fully rehabilitated,

Roads

Roads to Recovery – Childers Cove Road, Nirranda

$600000

The road pavement and surface has significantly deteriorated. There is substantial rutting and potholing along the road length. The road will be fully rehabilitated,

Roads

Roads to Recovery – Hopkins Falls Road, Hopkins Falls

$110000

Hopkins Falls Road (Rural Road) – Between chainage 0.000 kilometres and 11.953 kilometres measured from start. Formed table drains are not formed which is

Roads

Roads to Recovery – Occupation Lane, Garvoc

$120000

Occupation Lane (Rural Road) – Between chainage 0.000 kilometres and 12.960 kilometres measured from start. Formed table drains are not formed which is leading

Roads

Roads to Recovery – Hopkins Falls Road, Hopkins Falls

$760000

The road pavement and surface has significantly deteriorated. There is substantial rutting and potholing along the road length. The road will be fully rehabilitated,

Roads

Roads to Recovery – Castle Carey Road, Mortlake

$1450000

Castle Carey Road (Rural Road) – Between chainage 6.300 kilometres and 9.364 kilometres measured from start. The road pavement and surface has significantly deteriorated.

Roads

Roads to Recovery – Phillips Street, Port Fairy

$45804

Phillips Street, Port Fairy – Between chainage 0.000 kilometres and 0.377 kilometres measured from start. Gravel road wearing due to increase of traffic and

Roads

Roads to Recovery – Membreys Road, Macarthur

$460000

Membreys Road (Rural Road) – Between chainage 0.210 kilometres and 0.660 kilometres. The road pavement and surface has significantly deteriorated. There is substantial rutting