Orford – Telstra
Deployment of a new Telstra macro cell site and required fibre backhaul to Orford Funding Source | Australian Government: $400,950.00
Deployment of a new Telstra macro cell site and required fibre backhaul to Orford Funding Source | Australian Government: $400,950.00
Restoring the honour boards at Mortlake RSL. Funding Source | Australian Government: $3,145.00
This grant is to publish a book detailing Port Fairy’s involvement in the Second Boer War, as well as the First and Second World Wars. Funding Source | Australian Government: $3,000.00
To hold a ceremony to commemorate the centenary of the Battle of Lone Pine and install a flagpole at The Sisters Soldiers Memorial Hall Funding Source | Australian Government: $2,973.00
The project will replace two training lights that have recently blown. It will also replace two additional training lights that are old and in danger of blowing. The project will replace the globes with 2000 watt metal halide fittings and the associated electronic componentry. Funding Source | Australian Government: $5,000.00
The Purnim community has undertaken as a community priority, identified through its Purnim Community Plan, to install signage on the two main entrances to the Purnim Township on the Hopkins Highway. An artist has been secured to design and install the signage which will be a large two meter high basalt rock in the shape…
The permanent shelter zone will adjoin the Tarrone Hall and its original 1960s kitchen. It will be a structure 3 meters in height. The structure will consist of an iron roof and a 10.8′ x 6′ cement base. A roll-up PVC windbreak outdoor dining furniture and a BBQ will be included in the design. Funding…
This construction of a nature-based play space project will contribute towards a larger project to create a ‘play~skape’ that invites exploration of the natural environment by children of all ages. Elements of this play area will feature natural materials that will enhance habitat which simultaneously creating interesting and engaging props to scaffold imaginary play. The…
The Eumerella River Bank Rehabilitation project will see existing feral willow, poplar and box hawthorn trees removed and mulched. The river banks will then be rehabilitated with native trees and shrubs (with maybe an occasional selected exotic tree included) and walking tracks developed. A contractor will be tasked with on-site mulching/chipping of the trees (most…
The project will upgrade the building at the reserve by replacing the back portion of the pavilion roof which has been there since original construction in the 1970’s. The roof has been causing water damage to the inside of the pavilion. It was given a ‘bandaid’ repair in 2015 but we were informed that a…